Sunday, March 7, 2010

Process description

NNE Pharmaplan (Tianjin) Company LimitedIndustry:Pharmaceuticals/Biotechnology | Company Type:Foreign Company / Rep. Office | Company Size:100 - 499
Company Profile:It is a Novo Nordisk wholly-owned subsidiary company. Original name is Novo Nordisk Engineering.
2009-1 - Now Project Manager BeijingLocation:Beijing | Job Type:Full-time | Department:Project Execution | Report to:Director of Program Management | Number of Subordinates:employees | :
Job Category:Project Manager/SupervisorCareer Level:management ( manager / diector)
Responsibilities and Achievements:Responsibility:Preparation, planning, execution and close-out of projects characterized as “CAB Projects” from feasibility study phase to start up phase of the project, which have high complexity, high exposure, high business risks and/or high environmental impact.
1) Communication to internal stakeholders, external consultants, suppliers and authorities.
2) Team building for the project group.
3) Plan resources, time and economy according to agreed requirements and expectation as optimal as possible and secure fulfillment of the plans.
4) Ensure good conditions of service.5) Problem solving in the projects.Achievement:1) Production Extension Step 1 of Beijing Fresenius Kabi Pharmaceutical Co., Ltd
2) R&D Renovation of Novozymes (China) Investment Co., Ltd
Syngenta Biotechnology (China) Company LimitedIndustry:Pharmaceuticals/Biotechnology | Company Type:Foreign Company / Rep. Office | Company Size:100 - 499
Company Profile:2007-9 - 2009-1 Engineering ManagerLocation:Beijing | Job Type:Full-time | Department:Operation | Report to:Head of Biotech R&D, APAC/Head of Engineering, APAC | Number of Subordinates:5employees | :
Job Category:Engineering/Equipment ManagementCareer Level:management ( manager / director)
Responsibilities and Achievements:Overall responsible for efforts related to environment, health, safety, facility and equipment maintenance, asset management, IT, administration and site security. Ensures safe and efficient operation of the site and is involved with process optimization and enabling efforts. Interacts with general staff, site leadership, APAC infrastructure personnel and Biotech Engineering counterparts across the world.
1) Establish company policies, build engineering/EHS team and build the temporary facilities.
2) Preparation, planning, execution and close-out of the 2nd global R&D center.
3) Oversee maintenance and repair of site systems and equipment. Coordinate activity of outside contactors to ensure quality work and compliance with company policy.
4) Ensure safe working practices through understanding and compliance with environmental, safety, and health standards for company and statutory agencies within the work area and responsibilities of the role, including waste disposal and spill management requirements.
5) Ensure that company meets licenses, agreements, government regulations and corporate requirements for environment, safety and health. Monitor and audit performance and ensure that records of conformance are maintained and external reporting requirements are met.
6) Participate in long range planning and site strategy discussions and implement direction.7) Coordinate management of space, assets and other resources to maximize opportunities for the site.
8) Ensure compliance with corporate and site security requirements. Manage access control, CCTV system and security guards.
9) Coordinate landlord interactions and participate in lease related negotiations.
10) Responsible for people management and development of team members.11) Participate with site leadership on community and government relations.
Achievement:1) 2,400 m2 temporary R&D center.2) 3,000 m2 temporary greenhouse.3) Conceptual design of the 2nd global R&D center.Effem Foods (Beijing) Company LimitedIndustry:Consumer Products(FMCG) | Company Type:Foreign Company / Rep. Office | Company Size:500 - 999Company Profile:Famous FMCG Family Company2000-6 - 2007-9 Project Manager (PMP)Location:Beijing | Job Type:Full-time | Department:Operation | Report to:Technical Director | Number of Subordinates:10employees | :
Job Category:Project Manager/Supervisor
Lacoste Shirts
Career Level:management ( manager / director)Responsibilities and Achievements:Preparation, planning, execution and close-out of projects characterized as “CAB Projects” from feasibility study phase to start up phase of the project, which have high complexity, high exposure, high business risks and/or high environmental impact.
1) Translate the “Business Needs” into a project approach; defining, documenting and securing the capacity and investment plan onward in China.
2) Lead Feasibility Study to identify the Return on Investment (Internal Rate of Return).
3) Drive best practices utilization in project design and execution.
4) Drive the lean manufacturing concept into project and support the lean manufacturing strategy implementation.
5) Build and Maintain relationships with counterparts of Effem Foods business units worldwide.
6) Build needed project team, in cooperation with resource providers.
7) Achieve project objectives (quality, time and budget) and defined expectations from Stakeholders.
8) Develop and implement Project Quality Control and Assurance.
9) Control project cost estimating, planning/scheduling, project benchmarking, effective cost control/forecasting, effective project progress, contracting/procurement-plans, cash flow management and financial status of the project.
10) Manage the project interfaces with all parties involved, including internal and external communication and transfer of relevant project data according to a communication plan.
11) Lead the continuous improvement projects for the existing operation facilities to achieve total cost reduction goal.
12) Lead the development and maintenance of engineering processes and standards.13) Manage a number of projects simultaneously.14) Safeguard EHS requirements during a project lifcycle.15) Responsible for coaching of team members.Achievement:1) 1,000 tonne/year Mint Tablet Plant.2) 3,000 tonne/year Eclairs Plant .3) 8,000 tonne/year Skittles Plant .4) Integrated Petcare Factory (from Feasibility Study Phase to Start-up of New Factory).
5) Engineering Star (Award)--Continuous Improvement for the existing Petfood Plant.
--WHISKAS Product Improvement with SPF PE.6) OthersNestle Shuangcheng Company Limited
Cheap Lacoste Polo Shirts

Industry:Consumer Products(FMCG) | Company Type:Foreign Company / Rep. Office | Company Size:500 - 999
Company Profile:Fortune 500 FMCG Company No.1
1996-5 - 2000-6 Technical Support Mgr/Utility Engineer/Production Supervisor
Location:Shuangcheng | Job Type:Full-time | Department:Operation | Report to:Factory Manager/Engineering Manager/Production Manager | Number of Subordinates:20employees | :
Job Category:Product Development
Career Level:management ( manager / director)
Responsibilities and Achievements:
Responsibility:Technical Support Maager1) Deploy global/regional innovation projects to Nestle China business unit, as technical project leader.
2) Plan and deliver projects.
3) Develop and manage Recipe and Process Specifications of Raw Material and Finished Product.
4) Responsible for Process development work and Factory trials.5) Support Marketing and supply chain from technical part.6) Lead the continuous improvement work for the existing production lines.
Utility Engineer.1) Manage all site utilities and maintain all the key utilities in optimal status.
2) Perform and manage utility projects to modify site utilities capacity.
3) Perform energy saving activity .4) Help to set a long-term maintenance strategy and set PM schedule and take the responsibility of its implementation.
5) Set annual based training program, identify necessary working skills and expertise for all team members, direct and coach their day-to-day operation.
6) Responsible for all SOP/ emergency execution procedure writing/ updating and technical documentation collecting.
7) Prepare and submit annual based spare parts plan, help to integrate departmental capital expenditure plan.
8) Establish and maintain good relationship with local authority and all key suppliers.
Production Supervisor1) Organize, carry out & track production plan to ensure completion of production volume in right time.
2) Monitor and track production procedure to ensure product quality, and achieve the quality target.
3) Continue to reduce the material loss rate.4) Implement regular Safety & Security inspection to ensure that no accident happens during production.
5) Propose and establish training program, as well as monitor and train subordinates to improve the employees' techniques and overall performance level to build a successful team with responsibility,
enthusiasm and creativity.6) Drive user fixer program and implement routine equipment mantenance.
7) Collaborate with other functions to ensure smooth operation in line with site target.
Achievement:Technical Support Manager
1) Nesvita output is increased by 10%(420-460 kg/hr).
2) FIS027 Cereal Base (Big Flakes) output is increased by 20%(350-420 kg/hr).
3) Milk Rice output is increased by 25%(460-570 kg/hr).
4) OthersUtility Engineer
1) 40 m3/day (2%--16%) Sludge Dewatering System.3) 460 m3/hr Cooling Water System Expansion.4) OthersHeilongjiang Chemical Engineering Design Institute
Industry:Chemical Industry | Company Type:State-owned Company | Company Size:100 - 499Company Profile:1991-7 - 1996-5 Chemical Engineering Process Engineer
Location:Harbin | Job Type:Full-time | Department:Chemical Engineering Process | Report to:Manager of Chemical Engineering Process | Number of Subordinates:employees | :
Job Category:Career Level:Responsibilities and Achievements:Responsibility:
1) Calculation of Mass, Heat and Energy balances.2) Design of Flowsheet, Layout, Piping, Pipe support , Equipment list, Pipe installation list, Material list, Insulation list, Anti corrosion list and Process description.
3) Submission of design requirements for other dLacoste Polo Shirtsepartments, Utility, E&C, Building…
4) Problem solving on site during the execution phase of project.
Achievement:
1)10,000 tonne/year Sorbitol Project in Mudanjiang Pharmaceutical Factory.
2)20,000 tonne/year Synthetic Ammonia Expansion Project in Shuangcheng Fertilizer Factory.
3)1,000 tonne/year Vitamin C Project in Mudanjiang Pharmaceutical Factory.
4)Ten Million PCs/y Injection Norfloxacini Expansion Project in No.4 Pharmaceutical Factory of Harbin.